Home | About us | Sitemap | Web Links | Contact us

The PforR technical support mission from June 10 to June 28, 2013 included:

1. RforR program launch

2. Meeting with annual verification and otehr SAV related matters

3. Meeting on IT platform

4. Workshops on reporting formats, timelines and provincial annual plans

5. Progress on achieving Year 1 DLIs

6. Meetings with provinces to discuss due diligence report

7. Meeting with AUSAID

8. Kickoff workshops with provinces

9. Meeting on the impact evaluation

10. Wrap-up meeting

Aid Memmoir

 
gioi thieu web download co the down phan mem download ban hay xem bang sop thi down download sopcast xem bong da sopcast, download ultrasurf phan mem vao facebook ultrasurf, download hotspot shield vao facebook shield voi hotspot ban co the vao