Home | About us | Sitemap | Web Links | Contact us
Progress of RWSS NTP II Implementation NTP II Standing Office (SO) was established by Decisions 340/QĐ-BNN-TCCB on 5/2/2007 and 1464 /QĐ-BNN-TCCB on 24/5/2007, based at Water Resource Department. The SO directly supporting personnel includes 9 full-time staff, 1 national adviser and 1 international adviser, dividing into 3 groups on (i) planning and policy, (ii) M&E, science - technology and international cooperation, (iii) administration and communication. Nội dung chi tiết.
 
gioi thieu web download co the down phan mem download ban hay xem bang sop thi down download sopcast xem bong da sopcast, download ultrasurf phan mem vao facebook ultrasurf, download hotspot shield vao facebook shield voi hotspot ban co the vao