Home | About us | Sitemap | Web Links | Contact us

On 16/1/2013, the inter-ministerial circular 04/2013/TTLT-BNNPTNT-BTC-BKHĐT 16/1/2013 was signed by MARD, MOF, MPI to guide how to manage, spend State budget for the RWSS National Target Program during 2012-2015.

According to the circular, priority supports are given to:

- Poor areas; specially disadvantaged areas facing draught, pollution very often; mountainous areas, islands; poor, nearly poor households and policy households;

- renovation, repairation of RWSS schemes that have deteriotated or not fully operated; invested water supply schemes without standard water quality;

- budget allocation to the provinces/cities capable in the Program implementation

The full VN version is available on 04/2013/TTLT-BNNPTNT-BTC-BKHĐT 16/1/2013

 
gioi thieu web download co the down phan mem download ban hay xem bang sop thi down download sopcast xem bong da sopcast, download ultrasurf phan mem vao facebook ultrasurf, download hotspot shield vao facebook shield voi hotspot ban co the vao