Home | About us | Sitemap | Web Links | Contact us

On 11/8/2014 the wrap-up meeting was organized at MARD to brief the recommendations of 2014 NTP Join Annual Review and some isues relating to the implementation of the Porgram during the remaining time of NTP3 and the coming years.

The final JAR aid memmoir will be finalized and shared.

The JAR made 6 key draft recommendations focussing on:

1. Priority support, comprehensive approach, strategy for 18 months, remaining time of NTP3.

2. Assessment on correlation between IEC and behavior change

3. Budget planning process for 2015

4. O&M action plans

5. TPBS donor support priority to be give to weak performance provinces but ready to reform ans used as reward mechanism.

6. Issues to be considered by related ministries:

 

(i) likelihood of program targets being met by 2015;
(ii) water resource and changes in water supply master planning;
(iii) sector institutional/ governance structure, i.e. the future of state management functions and overseeing the sector beyond NTP 3;
(iv) pro-poor targeting;
(v) sustainability, and viability of socialization.

 

 
gioi thieu web download co the down phan mem download ban hay xem bang sop thi down download sopcast xem bong da sopcast, download ultrasurf phan mem vao facebook ultrasurf, download hotspot shield vao facebook shield voi hotspot ban co the vao