From 9 to 19 Novermber 2018, the WB mid term review mission on RB- SupRSWS was conducted.

Doan danh_gia_WB_19_Nov_2018

 

The mission found out that although some progress has been achieved in completing disbursement linked indicators (DLI) in 2016, 2017 and early 2018, the program implementation has been slow and not satisfied at medium level in terms of both progress and development objectives according to the WB review system.

 New arisen issues were not been mentioned directly although having important role in the other part of the program such as iec for water supply to contribute to achieving DLI on water supply connections (DLI 1.3) and sustainable connections (DLI 2.1), also finding out that full achievement of substainable water supply connection (80% of connection after 2 year operation) as the Program criteria is very challengeing, especially for the schemes managed by commune people committee. Therefore WB considred to revise the indicator sustainable connections (DLI 2.1) to be 2 levels

  • Medium substainable (level I): At leaset 60% of connections operating well after 1 year operation and implementing IEC on water supply.
  • Fully substainable: At least 70% of connections operating well after 2 year operation.

           

Source: NCERWASS

 